Image default
Health

FG flags safety risks in solar panel installations

FG flags safety risks in solar panel installations

 

The Federal Government, through the Nigerian Electricity Management Services Agency, has raised the alarm over the increasing number of fire incidents linked to improperly installed rooftop solar photovoltaic systems across the country.

As Nigeria’s power sector continues to operate below expectations, many Nigerians are turning to solar to escape blackouts. However, cases of fire outbreaks from rooftop solar panels are becoming a source of concern to both the government and citizens.

In a strongly worded public notice, NEMSA expressed serious safety concerns, noting that many of the reported incidents were associated with poor workmanship, the use of substandard materials, the absence of protective devices, and non-compliance with technical standards and regulations.

The public notice, signed by the Chief Electrical Inspector of the Federation, stated, “The Nigerian Electricity Management Services Agency has observed with serious safety concern the increasing number of fire incidents allegedly linked to improperly installed rooftop solar photovoltaic systems across the country.”

“It is important to note that while the adoption of renewable energy is strongly encouraged in line with Nigeria’s energy transition objectives, safety must remain paramount.”

Pursuant to Section 176 (m) and Section 184 (8) of the Electricity Act 2023, NEMSA has now issued comprehensive safety guidelines for the installation of rooftop solar PV systems in Nigeria.

The agency directed members of the public to engage the services of qualified and NEMSA-certified solar PV system installers only. It stressed that these certified professionals possess the necessary skills, experience, and knowledge of technical standards and regulations.

In the new guidelines released, NEMSA said, “The installation of the rooftop solar PV system must be carried out only by NEMSA-certified electrical contractors.

“The NEMSA-certified contractor must be in possession of his/her valid NEMSA competency certificate during the installation works.

“A load assessment of the facility or premises must be conducted prior to installation to ensure the system is appropriately sized and can operate safely.

“The roof must be structurally sound and capable of supporting the PV solar system.” ==== The Punch ====

Related posts

Gas explosion victims rise to 60

Editor

Lagos prosecutes over 8,000 environmental offenders

Editor

‘She tricked me’ — Cancer survivor, Deborah Mbara exposes Blessing CEO’s fraud

Editor

Leave a Comment